Construction Cost & Timeline Estimator

Rough, clearly-labelled-as-illustrative construction cost and timeline ranges by property type, built-up area and finish level, using current Bengaluru market rates. Built to set realistic expectations early rather than to quote a job.

2 minTo a result
FreeNo signup wall
2026Rates current to

What are you building?

Bengaluru rates as of August 2026. Excludes land, statutory approvals and interiors unless the premium band is selected.

Illustrative range

₹62.0 L₹76.7 LTotal construction cost, GST included
2,1002,600Per sq ft, standard finish
45.4Months to completion, typical
2,500Sq ft built-up

What this excludes.Land, plan sanction and approval fees, betterment charges, compound wall and landscaping, and interiors beyond the selected finish level. On a joint development, none of the developer’s marketing or financing cost is here either — which is why a developer’s number for the same building is usually higher than this one.

And the statutory cost, if you are buying

Karnataka doubled the registration fee from 1% to 2% in 2025. Within BBMP limits an additional cess applies, taking total statutory outlay above the ₹45 lakh threshold to roughly 7.5% of value. Duty is computed on consideration or guidance value, whichever is higher.

Illustrative planning ranges, not a quotation. Actual cost depends on soil and foundation requirement, structural design, specification, contractor and market conditions at the time you build. Use this to sense-check a number you have been given, not to replace a detailed estimate.